升降机升降平台升降货梯

About the installation of the shear fork elevator?关于剪叉式升降机的安装?

剪叉式升降机安装前要做好相应的准备,设备的安装技术员应进行地坑尺寸的再确认,进行水平测试,清点所有工具和安装部品后,就可进行安装作业。下面跟着小编一起聊了解看看该如何安装吧!

当该装置被放置在预凹坑,是需要利用叉车的,需载重台面较大叉车无法吊装时,这个时候就需要用于吊车。要先让这类设备是在关闭状态下的,用钢丝绳固定于底架上,用吊装的方式把设备放于预定位置。
所谓设备的简易固定资产就是用膨胀螺丝把设备可以稍加固定,等全部通过调整合格之后,才能得到彻底没有固定。设备之间放置固定好后,就可直接进行系统接线,把设备的行程控制开关线与控制线连接。控制箱、手柄按钮分别建立连接。将设备的油管与泵站连接,连接头间隔复合垫以防出现漏油。把设备的泵站、控制箱、台面上的手柄按钮实现全部连接好,就可等待试运转。
设备动力电缆连接,开始试机。将设备空载进行升降运动,中间停顿测试控制按钮。查看各按钮是否灵活有效。将设备满载后,再进行升降作业。查看各按钮是否灵活有效。能否正常运行。将设备升到比较高的点,检测台面与地坑有无接触间隙是否在合理范围。
安装时需把剪叉式升降机的载重台面吊起,使用升降机处于升起的状态,这样可以给安装员留出一定的空间,进行设备的安装固定。设备固定方法一般是用膨胀螺丝、或预埋件焊接的方法固定底架。设备载重小于等于1吨时,可以用膨胀螺丝固定,大于一吨载重,就要用焊接预埋件的方法进行固定。这种固定方法是设备正常使用的保证。

 Prior to the installation of the shear fork lift, the equipment installation technician shall reconfirm the size of the pit, conduct a level test, and inventory all the tools and installation parts before the installation. Below follow small make up to chat understand together to see how to install!

When the device is placed in a pre-pit, it is necessary to use a forklift truck, which cannot be lifted by a forklift with a large load table. To first make this kind of equipment is in the closed state, with the wire rope fixed on the bottom frame, with the method of lifting the equipment in a predetermined position.

The simple fixed assets of the so-called equipment is to use expansion screws to the equipment can be slightly fixed, after all through the adjustment of qualified, to get completely not fixed. After the devices are placed and fixed, the system can be wired directly to connect the device’s travel control switch line with the control line. The control box and handle buttons are connected respectively. Connect the tubing of the equipment to the pump station, and the connector spacer composite pad is used to prevent oil leakage. Connect all the pump station, control box and handle buttons on the platform of the equipment, and then wait for the test run.

Equipment power cable connection, start trial. Lift the device without load and pause the test control button. Check whether each button is flexible and effective. Load the equipment, then carry out lifting operation. Check whether each button is flexible and effective. Can it work properly? Raise the equipment to a higher point and check whether the contact gap between the mesa and the pit is within a reasonable range.

During installation, the load table of the shear fork lift shall be hoisted, and the lift shall be in the state of rising, so as to leave certain space for the installer to install and fix the equipment. Equipment fixing method is generally with expansion screws, or embedded welding method to fix the chassis. When the load of equipment is less than or equal to 1 ton, it can be fixed with expansion screws. If the load is greater than 1 ton, it should be fixed by welding embedded parts. This method of fixation guarantees the normal use of the equipment.



Prev:
Next:
Peace Corps Application Essay Tips For The Sat Trip To The Zoo Essay Example Title Of Research Paper About Bullying In School Presschool Homework Science Focus 1 Homework Book Essay On Baisakhi In English How To Write A Welcome Speeches For A Fundraising Event Example Essay Band 8 Fast Food Nation Analytical Essay Definition Mainstream In Education Pros And Cons Essay

无觅相关文章插件,快速提升流量

X

Online Chat

hello 您好,欢迎咨询,请问有什么可以帮您?